Establishing the College of Architecture and Planning at King Faisal University

A project to establish the College of Architecture and Planning at King Faisal University in Dammam

Implemented by: Kholoud Contracting Company

Kholoud Contracting Company implemented the project to establish the College of Architecture and Planning at King Faisal University in Dammam, with a total value of 24,016,455 Saudi riyals.

The most important items of construction work:

Excavation and backfilling works:
Excavation of building floors and foundations: 12,500 m3
Backfilling and leveling the land: 15,000 m3
Item cost: 1,250,000 riyals
Reinforced concrete works:
Total quantity of concrete: 6,500 m3
The cost of concrete and iron: 7,500,000 riyals
Masonry and brick works:
Total building area: 18,000 m2
Cost of construction and bricks: 3,800,000 riyals
Finishing and electrical and mechanical works:
Total finished areas: 16,000 m2
The cost of finishing, electrical and mechanical works: 11,466,455 riyals

This project was implemented with high quality in accordance with applicable engineering specifications and standards, which contributed to the success of the project and customer satisfaction.

Architectural Design:

The building was designed in a distinct modern style, combining architectural elegance and functionality
The external facades are a mixture of glass and stone facades, which adds an aesthetic look and diversity in appearance
Natural light and proper ventilation were emphasized in the interior design to provide a comfortable study environment
Green spaces and recreational spaces were integrated into the design to create an atmosphere of comfort and refreshment for students and academic staff

Technical Specifications:

High quality building materials such as reinforced concrete and cement bricks were used
Advanced electrical and mechanical systems have been installed, including air conditioning, lighting and safety
The building is equipped with high-speed electric elevators and advanced communications systems
The interior finishing works were carried out with high-quality materials such as marble, ceramics and noble woods

These design and technical specifications contributed to the success of the project and the achievement of the highest standards of quality and efficiency in establishing this specialized college.

Phase 1: Design and Planning (6 months)

Conduct preliminary studies and determine requirements
Developing the architectural and engineering design of the project
Preparing plans and executive drawings
Obtaining the necessary approvals and licenses

The second stage: preparations and equipment (9 months)

Developing the site and preparing the infrastructure
Purchasing and supplying construction materials and equipment
Preparing workshops and on-site warehouses
Recruiting and training the construction team

Phase Three: Construction Works (18 months)

Excavation and foundation works
Building and structural structures
Installation of electrical and mechanical systems
Internal and external finishing works

Phase Four: Operation and Delivery (6 months)

Testing of systems and facilities
Equipping and furnishing buildings and facilities
Training and preparation for operation
Delivery of the project and opening of the college